Quantity: | |
---|---|
Gold
XY-3
600M
90°~65°
30-1050rpm
250L/min
300mm
75mm
60mm
2500 * 900 * 1800mm
1600kg
Product Description
a. XY-3 water well drilling rig adopts CG140 model auto transmission, has 10 rotation speeds and easonable speed range, with eight forward roation gears and two reverse rotation gears, high speed, strong stroke and wide scope of application.
b. Large engine power and two reverse rotation gears, can easily solve the water well drilling work accident.
c. The operation handles are fixed together in reasonable layout to make it more convenient for workers to operate the machine.
d. Equipped with normally closed hydraulic chuck, operation is flexible and reliable
e. Spindle and hoist can be operated separately.
f. Spindle has big inner diameter, able to use big hexagonal drilling rod.
Unity machine parameter | |
Water well Drilling depth | 600m |
Max open hole caliber | 300mm |
End hole caliber | 75mm |
Drilling Rod diameter | 60mm |
Drilling angle | 90°~65° |
Dimension | 2500 x 900 x 1800mm |
Drill weight (without power) | 1600kg |
Spindle | |
spindle speed | Forward 30-1050r/min |
Reverse 29 137r/min | |
Spindle stroke | 600mm |
Spindle inner diameter | 96mm |
Lifting capacity | 6000kg |
Hoist | |
Max.Single line lifting capacity | 4000kg |
Max.Single line lifting speed | 0.5-1.9m/s |
Wirerope caliber | 12.5mm |
Wirerope length | 50m |
Reel diameter | 300mm |
Hug folldgate belt width | 90mm |
Mud pump | |
Type | BW-250 |
Displacement | 250 L/min |
Work pressure | 80kg/cm² |
Water inlet pipe diameter | 75 mm |
Water outlet pipe diameter | 50 mm |
Gear Oil pump | |
Duplex gear oil pump | CBF-F63/25 |
Front Displacement, pressure | 63 L/min 20Mpa |
Behind Displacement, pressure | 25 L/min 20Mpa |
Power | |
Diesel engine | 4105 76HP |
Electric motor | Y180L-4 59KW |
Ⅰ.Warranty
The main machine has 12-month warranty, excluding the wearing parts, we offer these parts with the lowest price for our customer.
Ⅱ.Installation and Commissioning
A.We provide our customers foundation and layout drawings after payment.
B. If needed, we will send technical engineers to the Buyer’s site for supervision of erection and Commissioning. Expenses abroad should be paid by the buyer.
Ⅲ. Inspection:
A. Customer inspection in factory;
B. Supplier offer pictures for inspection;
C. The third party inspection appointed by Customers.